[mesa-users] edit existing pgstar plot

Josiah Schwab jwschwab at berkeley.edu
Sat Oct 24 11:12:32 EDT 2015


Hi Amber,

> I would like to add a fixed box in an existing pgstar plot. Is this
> possible or do I have to rebuild the plot as my own creation and call
> on it that way?

As Frank says, more detail would be helpful.  There are built in
controls to draw boxes on the History_Track plots and their hard-coded
kin (e.g., HR diagram).  The keyword to look for is "target_box".

http://mesa.sourceforge.net/pgstar_defaults.html

Josiah




More information about the Mesa-users mailing list